PERTHUS TUNNEL (GIRONA)

Compártelo:

Tunnel made with double shield TBM. The Works carried out are: assembly and disassembly of the tunnel boring machine, formwork and pouring of concrete,  electrical installation of BT, etc.

Contractor: UTE Túnel del Perthus A.E.I.E. (Dragados, Eiffage).

DSC_0482 DSC01718 DSC01725 General IMG_0306 seleccion45

es_ESSpanish