Tunnel for high speed Atlantic axis. We provide personnel for TBM´s production and we carry out the production, storage and transport of concrete segment. Besides of it, we also provide machinery: three tractor trcuks, loaders in precast Factory, loaders in connection galeries, truck 6×4 with crane Fassi 660 AXP for works in the construction site, truck6x6 with deposit of 15,000 liters for drainage and irrigation, etc..
Contractor: Vigo-Das Maceiras Joint Venture (FCC, Acciona)
