Tunnel Of Trinitat (BARCELONA)
Tunnel made by tunnel boring machine TBM doble shield. We carrie out the complete assembly and disassembly works of the TBM. In addition we perform the task related to poduction in TBM, facilities maintenance and locomotive maintenance. Contractor: Join Venture Tunnel Of Trinitat (OHL, ACSA)
SURIA TUNNEL
We carry out the excavation of connection galleries by mechanical resources. Contractor: Suria tunnel joint venture (FERROVIAL-COPISA)
PERTHUS TUNNEL (GIRONA)
Tunnel made with double shield TBM. The Works carried out are: assembly and disassembly of the tunnel boring machine, formwork and pouring of concrete, electrical installation of BT, etc. Contractor: UTE Túnel del Perthus A.E.I.E. (Dragados, Eiffage).
SORBAS TUNNEL (ALMERÍA)
Tunnel for high speed train. The tasks developed were the following: assembly of the TBM, preparation of formwork for the construction site. Production, installation and maintenance work of conveyor belts and pipes Workforce specialists :electricians, warehouse, bridge cranes, locomotives, etc. Regarding the machinery, we provide the spayed concrete robot Putzmeister PM300 Contractor: Ute Túbas de […]
TERRASA TUNNEL
Construction of galleries by advance with mechanical means. The Brook demolition robot was used. Contractor: Tunnel Terrassa Joint Venture (FCC-OHL-COPISA)
SABADELL TUNNEL (BARCELONA)
Tunnel for high speed train line. Work done with EPB tunneling machine. We provided production personel in TBM and outdoors. Contractor: UTE Túnel Sabadell (ACCIONA-COMSA-ACSA)
BESSONS TUNNEL (CATALUÑA)
Tunnel built for the Segarra-Garrigues hydraulic channel. It was made with double shield TBM. We provide personnel of all kinds for both TBM and outdoor production. Contractor: UTE Les Garrigues – Section V (ACCIONA-ACSA- Const. RUBAU).
TUNNEL OF CAMPOBECERROS (A GUDIÑA)
Madrid-Galicia high-speed train line. TBM tunneling excavation. We provide personnel for production of precast concrete and the transfer and placement. Once placed, we perform the mortar injection between the sides for the waterproofing of the tunnel. Contractor: UTE Túneles de Bolaños (FCC and Acciona).
INTAKE HYDROELECTRIC POWER PLANT. (NAVARRA)
Completion of formwork, climbing platform, supply and placement of rebar. Moreover of these Works, one tower crane and several boom trucks were provided. Contractor: UTE CH Toma (Befesa-Iberdrola).
Quejigares Tunnel (Granada)
Tunnel for high speed train. All works related to the precast concrete, from the manufacture to transfer and collection. Contractor: UTE Quejigares. (Dragados-Tecsa).
Cádiz Bridge
Cable-stayed bridge for the transit of vehicles and high-speed train. The works developed were placement of rebar, formwork and pouring of concrete in the piles of the bridge. Contractor: UTE Puente de Cádiz (Dragados and Drace).
Pajares Tunnel (Asturias)
Tunnel executed in two different sections (lot IV and lot VI), one made with double shield TBM tunneling and another using the conventional method. We provide personnel to carry out activities of various kinds such as , gunner, mechanical , etc. Contractor: UTE Túnel Pajares IV (Copcisa, Hispánica, Bruesa Const., Azvi) and UTE Túnel Pajares […]