Túnel Campobecerros
Enero 2016 A fecha 28/01/2016 incorporamos el tercer turno de producción en la planta de dovelas de la Obra Túneles de Bolaños. Con este turno se prevé una producción diaria de 24 anillos
TUNNEL OF AVE VIGO-DAS MACEIRAS
Tunnel for high speed Atlantic axis. We provide personnel for TBM´s production and we carry out the production, storage and transport of concrete segment. Besides of it, we also provide machinery: three tractor trcuks, loaders in precast Factory, loaders in connection galeries, truck 6×4 with crane Fassi 660 AXP for works in the construction site, […]
Tunnel Of Trinitat (BARCELONA)
Tunnel made by tunnel boring machine TBM doble shield. We carrie out the complete assembly and disassembly works of the TBM. In addition we perform the task related to poduction in TBM, facilities maintenance and locomotive maintenance. Contractor: Join Venture Tunnel Of Trinitat (OHL, ACSA)
SURIA TUNNEL
We carry out the excavation of connection galleries by mechanical resources. Contractor: Suria tunnel joint venture (FERROVIAL-COPISA)
PERTHUS TUNNEL (GIRONA)
Tunnel made with double shield TBM. The Works carried out are: assembly and disassembly of the tunnel boring machine, formwork and pouring of concrete, electrical installation of BT, etc. Contractor: UTE Túnel del Perthus A.E.I.E. (Dragados, Eiffage).
SORBAS TUNNEL (ALMERÍA)
Tunnel for high speed train. The tasks developed were the following: assembly of the TBM, preparation of formwork for the construction site. Production, installation and maintenance work of conveyor belts and pipes Workforce specialists :electricians, warehouse, bridge cranes, locomotives, etc. Regarding the machinery, we provide the spayed concrete robot Putzmeister PM300 Contractor: Ute Túbas de […]
TERRASA TUNNEL
Construction of galleries by advance with mechanical means. The Brook demolition robot was used. Contractor: Tunnel Terrassa Joint Venture (FCC-OHL-COPISA)
SABADELL TUNNEL (BARCELONA)
Tunnel for high speed train line. Work done with EPB tunneling machine. We provided production personel in TBM and outdoors. Contractor: UTE Túnel Sabadell (ACCIONA-COMSA-ACSA)
BESSONS TUNNEL (CATALUÑA)
Tunnel built for the Segarra-Garrigues hydraulic channel. It was made with double shield TBM. We provide personnel of all kinds for both TBM and outdoor production. Contractor: UTE Les Garrigues – Section V (ACCIONA-ACSA- Const. RUBAU).
TUNNEL OF CAMPOBECERROS (A GUDIÑA)
Madrid-Galicia high-speed train line. TBM tunneling excavation. We provide personnel for production of precast concrete and the transfer and placement. Once placed, we perform the mortar injection between the sides for the waterproofing of the tunnel. Contractor: UTE Túneles de Bolaños (FCC and Acciona).
INTAKE HYDROELECTRIC POWER PLANT. (NAVARRA)
Completion of formwork, climbing platform, supply and placement of rebar. Moreover of these Works, one tower crane and several boom trucks were provided. Contractor: UTE CH Toma (Befesa-Iberdrola).
Quejigares Tunnel (Granada)
Tunnel for high speed train. All works related to the precast concrete, from the manufacture to transfer and collection. Contractor: UTE Quejigares. (Dragados-Tecsa).